Section 7-RISK ASSESSMENT


RISK ASSESSMENT



College/Course/Class/Group
As Media, Block E



Project title
Dirty Ego



Scene/Item/Feature
Scene 1



Date of period this risk assessment covers
November-December 2011



Producer
She Rock



Location address & details
Padgate Train Station, Warrington





Place the Y in the box which the hazards are identified and refer these to your tutor for authorisation
HAZARD
HAZARD
HAZARD
Costume/make up
Access
Machinery
Hydraulics
Animals
Mines/excavations/tunnels/quarries
Catering
Audience/Public
Y
Noise
Y
Lighting
Communications
Person with special needs
Scaffolds
Confined spaces
                                                   
Physical exertion
Smoke effects
Derelict buildings/dangerous structures
Speed
Stunts
Electricity/gas
Vehicles and off road driving
Y
Physical effects
Fire/flammable materials
Violence/public disorder
Fight sequence
Water/Tide
Glass
Weather
Y
Hazardous substances/chemicals
Working at heights
Heat/cold
                                                
Other
Inexperienced performer or children N.B. For children, a copy of this risk assessment must be provided to parent/guardian



Equipment: (Please list any equipment that might be affected by the activities you have ticked above).

If the day of shooting’s weather is wet, the camera equipment may be effected. The lighting and noise may affect the quality of our film. As it is a public area filming may affect people’s access to some areas of the train station.








Details of Activity:
Filming character on train, and getting off it. Filming various shots of the train moving from different angles and locations.







Hazards Identified and Risks Arising
Wet weather, public being affected in filming process




Risk Assessment and Proposed Precautions
Weather will be checked on morning of shooting, only areas will be cut off the public do not need to access trains.




N.B. THIS MUST BE SIGNED BEFORE THE PRODUCTION CAN GO AHEAD
I have read the above and am satisfied that:
It constitutes a proper and adequate risk assessment in respect of the programme activity and that the precautions identified are sufficient to control the risks.
Adequate arrangements are in place to communicate the risk assessment findings and to co-ordinate the safety arrangements of all those affected. E.g. site owners, contractors, volunteers etc

Signature of Producer: She Rock________________     Date:20.10.10____________
Name of Producer: She Rock

Signature of Tutor:_______________________________Date:__________________

Name of Tutor:

RISK ASSESSMENT



College/Course/Class/Group
As Media Block E



Project title
Thriller opening- Dirty Ego



Scene/Item/Feature
Scene 2



Date of period this risk assessment covers
November-December 2011



Producer
She Rock



Location address & details
1 Station Cottage, Station Road, Padgate




Place the Y in the box which the hazards are identified and refer these to your tutor for authorisation
HAZARD
HAZARD
HAZARD
Costume/make up
Access
Y
Machinery
Hydraulics
Animals
Mines/excavations/tunnels/quarries
Catering
Audience/Public
Noise
Lighting
Communications
Person with special needs
Scaffolds
Confined spaces
Y                                                    
Physical exertion
Smoke effects
Derelict buildings/dangerous structures
Speed
Stunts
Electricity/gas
Vehicles and off road driving
Physical effects
Fire/flammable materials
Violence/public disorder
Fight sequence
Water/Tide
Glass
Weather
Hazardous substances/chemicals
Working at heights
Heat/cold
                                                
Other
Inexperienced performer or children N.B. For children, a copy of this risk assessment must be provided to parent/guardian



Equipment: (Please list any equipment that might be affected by the activities you have ticked above).

Small spaces may affect the camera equipment, it may be hard to move around and use a tripod.







Details of Activity:
Filming the notice board, different angles and shots of the board and the person creating it.







Hazards Identified and Risks Arising





Risk Assessment and Proposed Precautions
Actors will approve of room and stairs will have a banister.




N.B. THIS MUST BE SIGNED BEFORE THE PRODUCTION CAN GO AHEAD
I have read the above and am satisfied that:
It constitutes a proper and adequate risk assessment in respect of the programme activity and that the precautions identified are sufficient to control the risks.
Adequate arrangements are in place to communicate the risk assessment findings and to co-ordinate the safety arrangements of all those affected. E.g. site owners, contractors, volunteers etc

Signature of Producer: She Rock________________     Date:20.10.10____________
Name of Producer: She Rock

Signature of Tutor:_______________________________Date:__________________

Name of Tutor: